Dirty Job

We are getting very close to starting construction. Our builder is ready to get started as soon as the City approves the plans. Anything left in the building will be demolished and sent to the dump.  We wanted to save some of the beadboard downstairs and the remaining ceiling tins upstairs.

Here is the beadboard next to the Material Lift prior to demo.

UNADJUSTEDNONRAW thumb 2cffUNADJUSTEDNONRAW thumb 2cfe

Then after demo.  This is also a really good picture of the outside of the Material Lift.  

UNADJUSTEDNONRAW thumb 2d0dUNADJUSTEDNONRAW thumb 2d2b

Check out the Aluminum door behind the lift. It was a fire door that opened into the Shaw building. The opening was bricked in, but the door remains,.  No telling how old it is, but it is really heavy.    

UNADJUSTEDNONRAW thumb 2d0cUNADJUSTEDNONRAW thumb 2d27

Upstairs, during the removal of the ceiling tins.  

UNADJUSTEDNONRAW thumb 2d30UNADJUSTEDNONRAW thumb 2d2eSome interesting things we found above the ceiling tins.UNADJUSTEDNONRAW thumb 2d34

And finally the results of doing a Dirty Job:)UNADJUSTEDNONRAW thumb 2d35

No Comments

Post a Comment