Demo Updates

Below are some of the final pictures of us removing ceiling tin and bead board prior to our contractor starting the roof replacement.

This is the Material lift upstairs after we removed the bead board next to it.

UNADJUSTEDNONRAW thumb 2d6a

Upstairs after cleaning up.

UNADJUSTEDNONRAW thumb 2d6d

Straight on view of the Material Lift

UNADJUSTEDNONRAW thumb 2d82

Looking up the stairs toward the 2nd floor. 

UNADJUSTEDNONRAW thumb 2d80

Downstairs in the back next to the lift looking upwards.  This is where all the wood was stored.  It will be our garage store room.  

UNADJUSTEDNONRAW thumb 2d6bUNADJUSTEDNONRAW thumb 2d68

And finally the irony photo. This is going down the stairs:) To bad the building was in a fire in the 60’s when the Shaw building next door burned down. This is the reason for the fire damage upstairs in the rafters.  And the reason we don’t mind installing a sprinkler system in the building. 

UNADJUSTEDNONRAW thumb 2d81

Fire damage upstairs

UNADJUSTEDNONRAW thumb 2d55

And our mess:)

UNADJUSTEDNONRAW thumb 2d76UNADJUSTEDNONRAW thumb 2d89

No Comments

Post a Comment