Below are some of the final pictures of us removing ceiling tin and bead board prior to our contractor starting the roof replacement.
This is the Material lift upstairs after we removed the bead board next to it.
Upstairs after cleaning up.
Straight on view of the Material Lift
Looking up the stairs toward the 2nd floor.
Downstairs in the back next to the lift looking upwards. This is where all the wood was stored. It will be our garage store room.
And finally the irony photo. This is going down the stairs:) To bad the building was in a fire in the 60’s when the Shaw building next door burned down. This is the reason for the fire damage upstairs in the rafters. And the reason we don’t mind installing a sprinkler system in the building.
Fire damage upstairs
And our mess:)
No Comments