They started this past week removing the original floor boards upstairs. The original boards were too damaged and it was not economical to save them. They are going to brace the existing floor joists and then install a new sub-floor making everything level before install new Engineered Hardware Flooring.
There was a lot of dirt and trash under the floor and above the 1st floor ceiling. They had to shovel and vacuum everything up so it’s all clean before starting new.
Finally there are a lot of holes that will need to be patched above and below.