Framing Continued

We have the start of walls upstairs. They have started framing out the bathroom, 1/2 bath, mechanical room, and the closet worthy of a queen:)

UNADJUSTEDNONRAW thumb 2ec1

This is the closet area. When it’s done, it will be 16 x 17 and have a round couch in the middle with a large chandelier above it.

UNADJUSTEDNONRAW thumb 2ec3

The shower area and Master Bath area. The shower will be all glass with the brick wall on one side.

UNADJUSTEDNONRAW thumb 2ec5

The picture below shows the overall size of everything. These are going to be the only walls.Everything else will be wide open. The windows on the right side will be opened to bring in a lot of more natural lighting. If you look closely you can see the plumbing on the right where our kitchen island will be.

UNADJUSTEDNONRAW thumb 2ec6

And finally looking forward.Things are coming along! This shows the 1/2 bath and mechanical room entrance.

UNADJUSTEDNONRAW thumb 2ebf

No Comments

Post a Comment