This week they continued to work on the HVAC Ducts.
Along with the HVAC they started to blow in the insulation under the floor.
This upcoming week they are going to start on the front and west sides of the building. They will be preparing and then applying the Elastomeric Paint to the outside walls. We are going with a cream color with white trim to restore the outside to how it looked back in the 20’s.
Blair Herzig
September 19, 2018 at 10:53 amGod bless you for fixing that building. The Comic Boxx was open when I first moved to Cleburne and I have always loved that location. We live in one of the Historic (built in 1910) homes on Forrest Ave and I love anything that restores and revitalizes these treasures. I am not sure what your business will be but I wholeheartedly support it. Keep up the great work!