This has been a significant week. We have electric and heat upstairs. They are still working on the HVAC units downstairs. They should have those completed the first part of this upcoming week.

Here is the chandelier above the Material Lift. We still need to clean it and add the crystals.

UNADJUSTEDNONRAW thumb 332c

The lights above the kitchen island.

UNADJUSTEDNONRAW thumb 332d

Here are the lights above the Camera Bar. It’s actually a Consolidated Lithograph Camera that we found during the demolition of the upstairs. The lights are a part of the camera and we had them installed above shining downward. Once everything is clean, we are going to add glass and place bar stools around it.

UNADJUSTEDNONRAW thumb 3339

Our bathroom vanity lights. The mirrors will be added after painting. The vanity is an antique buffet from Austria that we found in Dallas. We cut holes and added the vessel sinks and faucets to make it a working sink.

UNADJUSTEDNONRAW thumb 3335

The crystal chandelier in the closet. The electrician still needs to lower it. Also we left the plastic on it until we finish painting.

UNADJUSTEDNONRAW thumb 333d

We also have a chandelier above the bed and when you first walk up the stairs. I’ll add more photos of them once they are cleaned and lowered.

Stay tuned for more finishing photos.