Final Push

It’s the final week before Candlewalk. The only things left are cosmetic and cleaning.

The shower is finished with a wall of glass.

UNADJUSTEDNONRAW thumb 3370

We continue to clean and paint the Otis Material Lift.

UNADJUSTEDNONRAW thumb 336d

UNADJUSTEDNONRAW thumb 336e

The brick is almost finished being sealed.

UNADJUSTEDNONRAW thumb 3362

The stairs still needed finishing.

UNADJUSTEDNONRAW thumb 336a

Downstairs we are cleaning and preparing for decorations.

UNADJUSTEDNONRAW thumb 336b

UNADJUSTEDNONRAW thumb 3363

Also downstairs they finished the riser for the Fire suppression System. We have done everything we can until the City extends the water main across the street.

UNADJUSTEDNONRAW thumb 336f

And finally the sign in front of the building for the Candlewalk Tour Home. This week we will be painting, cleaning, and staging upstairs.

UNADJUSTEDNONRAW thumb 3369