Store Front Repair Part 2

The repair work is almost complete downstairs. Everything is buttoned up and all that is left is the false louvers above the windows. 

UNADJUSTEDNONRAW thumb 3609

Half of them are complete. Our painter will then clean everything up and paint the complete front. It will be the same yellow with white trim as above.

UNADJUSTEDNONRAW thumb 360a

Inside we still need to mount dry wall and have it painted. That will be in the next two weeks also.

UNADJUSTEDNONRAW thumb 360bUNADJUSTEDNONRAW thumb 360c