Its been awhile since posting. We have official reopened downstairs after being closed for 2 months due to the Corovirus. During our closed period we deconstructed the displays on the East wall and replaced them with hanging wine crates for chocolate. In the back we built a 16’ Root Beer Bar. Here are some nighttime photos. Come by and let us know what you think.

IMG 5941IMG 5942

Officially Open

We are officially open. Our grand opening was a huge success. 

2E245ACB DEA5 4F58 AAF2 340A18757239 1 102 o

 

The candy displays look wonderful, especially at night!!!!

3A410A28 0474 4F4A A197 95A48C416037 1 105 c

Also in the day:)

EB1906F5 362F 4F54 9257 38B9F3C3AE9E 1 105 c

And our sitting area and International Marketplace displays turned out incredible:)

CBFC8D1F 8668 497D 9E92 6CA7CBFF29A9 1 105 c

Overall it has been hectic the last few days, but it has been worth it!!!

Trovato Street

Its finally confirmed, we are opening Trovato Street downstairs. It’s an International Marketplace with Nostalgic Candy. This idea has been in the works for a few months but until we had a Manager, and the Certificate of Occupancy downstairs, we did not want to jinx it:) We are opening on Halloween and will be open through the weekend for Cleburne’s Christmas Shopping event on Sunday. After that, we will be open normal hours. We are still working those out:)

Here are a few pictures while we get ready.

The Candy displays are based on the 1920’s parts counters we recovered from the building during the renovation.

845F649A A309 4D76 AE0B 5DEB1405DA3E 1 105 cE5E7A859 D95D 40EF BFBB 484F489ACD89 1 105 c1FC99B48 7263 482F 8C9D 5EEA4A56C63A 1 105 c

Historic signage from Cleburne.

21458EB2 028F 4B41 82E0 F6D2007854C0 1 105 c

The International Market place displays still under construction.

D5FDC212 D3D6 4CE3 979B 2433D5C02DEC 1 105 c25621B8B 4CE8 4BE3 9ED7 529542BF59F2 1 105 c

Stay tuned this week for our Facebook and Web Page to go live!!!! I’ll post them here once they are published.

Ready for Paint

Everything outside is finished and ready for paint. Inside I mounted wood on the backside with trim pieces and caulking. This week our painter will start with the outside and hopefully work his way inside. We are looking forward to finishing up the front of the building.

UNADJUSTEDNONRAW thumb 361c

UNADJUSTEDNONRAW thumb 361dUNADJUSTEDNONRAW thumb 3620

Store Front Repair Part 2

The repair work is almost complete downstairs. Everything is buttoned up and all that is left is the false louvers above the windows. 

UNADJUSTEDNONRAW thumb 3609

Half of them are complete. Our painter will then clean everything up and paint the complete front. It will be the same yellow with white trim as above.

UNADJUSTEDNONRAW thumb 360a

Inside we still need to mount dry wall and have it painted. That will be in the next two weeks also.

UNADJUSTEDNONRAW thumb 360bUNADJUSTEDNONRAW thumb 360c

Flooring Saga Continues

This weekend we continued to work on the downstairs flooring. This is the before on the West side. We have been working with no air conditioning. The front has holes where our contractor is rebuilding the windows. There is no sense in turning the AC on until the front is complete. Today was only 101 degrees:)

UNADJUSTEDNONRAW thumb 35f5

And the after. It’s still wet. It will dry with a satin sheen.UNADJUSTEDNONRAW thumb 35f9

We are almost complete downstairs. Once the store front is complete, we will finish painting everything, mount the baseboards, and cleanup the center columns. Stay tuned for what’s coming next:)

History Revealed

It’s been a few weeks since the last update. A lot has happened since then. History has been revealed in the front of the building. For right now we are rebuilding the area above the existing store front. We will be reusing the existing glass/doors and repaint everything once its complete.

UNADJUSTEDNONRAW thumb 35e1UNADJUSTEDNONRAW thumb 35eb

One incredible item uncovered was the original steel column on the North West corner of the building. The new design will have the tops of the columns above the glass exposed.UNADJUSTEDNONRAW thumb 35d1

While the front demolition/rebuild is going on we are finishing the floor.

The floor after the repairs and sanding. 

UNADJUSTEDNONRAW thumb 35e2

And now here is the floor with the first coat of stain and sealant.

UNADJUSTEDNONRAW thumb 35e9