In Progress Upstairs Photos

It’s still a work in progress. People have been asking for updated photos of the upstairs. We are still unpacking and taking our time arranging everything, so we have not posted that many new photos. We will post complete photos once everything is unpacked, paintings hung, and everything is organized. 

Until then, here are a few photos. We installed new light bulbs above the kitchen island. The original Edison Bulbs were not bright enough. We love the stainless steel countertop!!!!!

UNADJUSTEDNONRAW thumb 34a1

Our office areas and breakfast table. Lots of open space!!!!

UNADJUSTEDNONRAW thumb 349f

Our bedroom area. We are trying out a new bed cover:)

UNADJUSTEDNONRAW thumb 34a0

And finally our front door. We are restoring an antique buffet to place next to the door.

UNADJUSTEDNONRAW thumb 349e

Evening Lights

Just a few evening lights. 

The courthouse looking out our front door.

UNADJUSTEDNONRAW thumb 3488

The new light we installed today above the door to the commercial area. It’s an LED that is bluetooth controlled. We can change it during the holiday’s to different colors. That should be fun:)

UNADJUSTEDNONRAW thumb 3486

Our Main Door with the LED Flame lights.

UNADJUSTEDNONRAW thumb 3487

And some pictures inside. The kitchen area.We are still decorating and getting ready to hang some pictures.

UNADJUSTEDNONRAW thumb 3489

And our bedroom area at night.

UNADJUSTEDNONRAW thumb 348a

Unpacking

Its been a busy couple of weeks. We are still trying to organize everything the way we would like. We have started a listing of the outstanding projects and items we would like to complete. This building is going to be a work in progress for a long time!!!!! The best part is we are now moved in and can do them at our pace.

The kitchen is coming together. We are still looking for bar stools that will match the industrial look.

UNADJUSTEDNONRAW thumb 3446

The living area. We placed our lounge chairs there until we can find a couch we like. Our TV is way too small for that wall:) One of the items on our list is to place glass above the Camera and mount bar stools along both sides creating a bar area.

NewImage

One of the best views in the loft is lying in bed and looking up:) This is the chandelier above the bed.

UNADJUSTEDNONRAW thumb 344a

And finally, the weather was beautiful today so I took the drone out and got some incredible video of downtown Cleburne. I’ll post the video once I clean it up. Here is a sample screenshot. This is the American Flag on top of the Courthouse with our building in the backround.

NewImage

Candlewalk Tour of Homes

Candlewalk was a huge success!!!! Everyone was very positive about what we had done. Here are some photos from the staging. I’ll post more later this weekend.

The steps leading down to the garage.

UNADJUSTEDNONRAW thumb 338a

The area next to the Material Lift.

UNADJUSTEDNONRAW thumb 3393

The Material Lift.

UNADJUSTEDNONRAW thumb 3386

The Kitchen area.

UNADJUSTEDNONRAW thumb 3389

The Closet for My Queen:)

UNADJUSTEDNONRAW thumb 338f

The bathroom vanity.

UNADJUSTEDNONRAW thumb 3387

 

The main living area.

UNADJUSTEDNONRAW thumb 3388

The sitting and bedroom areas with the wine bar in the middle. The furniture was staged by Owen’s Home Furnishings.The wine bar was original from the building when it was American Dry Goods. It was a display case to hold small mechanical parts like nuts, bolts, and washers.

UNADJUSTEDNONRAW thumb 338e

Downstairs with the windows cleaned.

UNADJUSTEDNONRAW thumb 3382

And finally the torches on the fire escape. They are LED Bulbs made to simulate fire.

UNADJUSTEDNONRAW thumb 3371

Final Push

It’s the final week before Candlewalk. The only things left are cosmetic and cleaning.

The shower is finished with a wall of glass.

UNADJUSTEDNONRAW thumb 3370

We continue to clean and paint the Otis Material Lift.

UNADJUSTEDNONRAW thumb 336d

UNADJUSTEDNONRAW thumb 336e

The brick is almost finished being sealed.

UNADJUSTEDNONRAW thumb 3362

The stairs still needed finishing.

UNADJUSTEDNONRAW thumb 336a

Downstairs we are cleaning and preparing for decorations.

UNADJUSTEDNONRAW thumb 336b

UNADJUSTEDNONRAW thumb 3363

Also downstairs they finished the riser for the Fire suppression System. We have done everything we can until the City extends the water main across the street.

UNADJUSTEDNONRAW thumb 336f

And finally the sign in front of the building for the Candlewalk Tour Home. This week we will be painting, cleaning, and staging upstairs.

UNADJUSTEDNONRAW thumb 3369

Getting Noticed

The closer we get, the more people are noticing what we are doing. This past week we had some members of Cleburne City Council walk through. The local newspaper did a story on our transformation. And numerous people have been posting on Facebook our status.

Here is the link to the story.

https://www.cleburnetimesreview.com/news/transformation/article_2b2d42b6-ef66-11e8-a7e8-fbddb1975e89.html

Finally we are going to be featured on Cleburne’s Annual Candlewalk Historic Tour of Homes hosted by Save Old Cleburne.

https://www.eventbrite.com/e/candlewalk-historic-home-tour-2018-tickets-52434795886.

Now it’s a mad rush to get the building ready. Some photos of this week’s progress:

Sealing the brick upstairs.

UNADJUSTEDNONRAW thumb 334b

Restoring an antique display rack. From what we have found, it was used to display small parts when the building was home to the American Dry Goods Store in the 1920’s. We are planning on using it as a coffee bar upstairs.

UNADJUSTEDNONRAW thumb 334a

The chandelier in the closet. We just finished the brick and will be painting the walls and ceiling this week.

UNADJUSTEDNONRAW thumb 3349And finally our painter finished trimming the outside areas.

UNADJUSTEDNONRAW thumb 3345

The end is in sight and we will be moving in before the end of the year. 2 1/2 years in the making!!!!

Material Lift Finish Out

The Material lift is being finished out.

Here are the doors upstairs.They will be repainted white and the metal grating, in the middle of the doors, will be black.

UNADJUSTEDNONRAW thumb 333c

We are still adding railing and wire cables. Once everything is installed, we will repaint everything black to match the original design.

UNADJUSTEDNONRAW thumb 3334

UNADJUSTEDNONRAW thumb 332f

And finally, the fire doors on the first floor leading into the Material Lift.

UNADJUSTEDNONRAW thumb 3299

 

Lighting

This has been a significant week. We have electric and heat upstairs. They are still working on the HVAC units downstairs. They should have those completed the first part of this upcoming week.

Here is the chandelier above the Material Lift. We still need to clean it and add the crystals.

UNADJUSTEDNONRAW thumb 332c

The lights above the kitchen island.

UNADJUSTEDNONRAW thumb 332d

Here are the lights above the Camera Bar. It’s actually a Consolidated Lithograph Camera that we found during the demolition of the upstairs. The lights are a part of the camera and we had them installed above shining downward. Once everything is clean, we are going to add glass and place bar stools around it.

UNADJUSTEDNONRAW thumb 3339

Our bathroom vanity lights. The mirrors will be added after painting. The vanity is an antique buffet from Austria that we found in Dallas. We cut holes and added the vessel sinks and faucets to make it a working sink.

UNADJUSTEDNONRAW thumb 3335

The crystal chandelier in the closet. The electrician still needs to lower it. Also we left the plastic on it until we finish painting.

UNADJUSTEDNONRAW thumb 333d

We also have a chandelier above the bed and when you first walk up the stairs. I’ll add more photos of them once they are cleaned and lowered.

Stay tuned for more finishing photos.

More Pictures

Here are some more pictures.

The outside stairs. They will be placing the HVAC cooling units underneith.UNADJUSTEDNONRAW thumb 32ed

Our new floors. We still have to seal the brick. This will be a sitting area.

UNADJUSTEDNONRAW thumb 32e4

The original handrail going downstairs. These were from the original building. We stripped them down and will stain them once construction is complete.

UNADJUSTEDNONRAW thumb 32e5

The half wall along the stairs.

UNADJUSTEDNONRAW thumb 32df

And finally another photo of the shower flooring.

UNADJUSTEDNONRAW thumb 32db

Shower – Countertop – Stairs

It’s been two weeks since the last update. I’ve been traveling for work but a lot has happened at the building.

Our shower is coming along. It will be Slate tile on the shower head wall and River Rock on the floor. Finally there will be a glass separator wall once they complete all the tile work.

IMG 4710IMG 4712

 

The outside stairs are almost complete.

IMG 4698IMG 4700IMG 4702

 

And we had our stainless steel countertop installed. It was interesting getting it upstairs. It did not look that big in the drawings:) It was custom ordered from Sealtex in Dallas. They were very professional and did an incredible job!!!!!

https://www.sealtex.com

IMG 4694IMG 4695IMG 4688

 

Finally we started the railing around the Material Lift.

 IMG 4720IMG 4716

This week will consist of the installation of the sprinkler systems, electrical, flooring, and the finish of the HVAC. They have about half of the flooring complete. Its manufactured hardwood and looks incredible!!!!!!!

IMG 4709