The last two weeks have been about the same. Dry wall continues, electrical continues, and we continue to seal the brick.
Here is where we are so far.
The entrance to the bathrooms and janitor closet downstairs.
The commercial space rear exit door.
This is in back of the building where our garage area will be. Here are the fire doors leading into the material lift.
And the storage area next to the lift.
Here is the second floor, as soon as you come up the stairs. We are planning on using this as a sitting area for right now. They have started hanging the chandeliers. Once they are completed with the construction, we will add the crystals and lower them to the proper height..
The upstairs mechanical room and half bath.
The lights above our kitchen island. They should be installing the stainless steel counter top later this week. We covered the cabinets with plastic and cardboard to protect them while construction is going on.
The chandelier above our bed.
Our front door is getting ready to be installed.
Dry wall in the master bath where our vanity will be installed.
And finally the closet worthy of My Queen:) We are still sealing the brick. In this picture the brick is still wet. Under the chandelier there will be the round leather couch.
This upcoming week should be the finish of the drywall, outside staircase, countertops, and the electrical finish out.