The Material lift is being finished out.
Here are the doors upstairs.They will be repainted white and the metal grating, in the middle of the doors, will be black.
We are still adding railing and wire cables. Once everything is installed, we will repaint everything black to match the original design.
And finally, the fire doors on the first floor leading into the Material Lift.