Store Front Repair Part 2
The repair work is almost complete downstairs. Everything is buttoned up and all that is left is the false louvers above the windows.
Half of them are complete. Our painter will then clean everything up and paint the complete front. It will be the same yellow with white trim as above.
Inside we still need to mount dry wall and have it painted. That will be in the next two weeks also.
Water Main Extension Finished
There is mud everywhere but they finished the water main extension from across the street. Once everything dries out they will pave it over. It’s been a dirty couple of weeks. We have footprints all over our new floors. This past weekend they filled the pipe with water to ensure there are no leaks. This week everything will be connected and the water turned on to our Fire Suppression System.
Water Main Continues
We thought they were almost done. The City decided to extend the water main all the way down the alleyway. This makes sense so that the buildings on Caddo Street can utilize it without having to tie into the Water Main in front, on Caddo Street, which is a State Highway.
We have had rain the last couple of days and it’s a muddy mess.
Here’s what the actual water main looks like.
This has been an adventure watching them work:)
Getting Closer
We are getting closer. They finished painting the front and west sides of the building.
They started framing of the 2nd floor windows. When we installed the new windows they temporary installed them to dry in the building. Now they are finishing the installation.
HVAC continues downstairs.
And we started to seal the upstairs brick in the shower area.
Before
After
Finally framing is almost complete. Here is the rotating door to the closet. We salvaged it from the building when there was a photography business upstairs and they had a dark room door.
Exterior Painting
We are starting to get noticed!!!!! Almost everything up to this point has been inside and not exposed to the general public. This week, all of that has changed. We were going to wait until the very end to paint the exterior walls but they needed it completed prior to installing the fire escape stairs on the west wall. The weather slowed them down but they should finish everything this upcoming week.
The exterior painting is being completed by Guillermo’s Painting located at 2209 N. Main St. Ste 168, Cleburne, TX