All cleaned up and painted. We still have some minor accents and the top is getting “Wilson 1881”. Overall its looking good!!!!
Posts Tagged with painting
Final Push
It’s the final week before Candlewalk. The only things left are cosmetic and cleaning.
The shower is finished with a wall of glass.
We continue to clean and paint the Otis Material Lift.
The brick is almost finished being sealed.
The stairs still needed finishing.
Downstairs we are cleaning and preparing for decorations.
Also downstairs they finished the riser for the Fire suppression System. We have done everything we can until the City extends the water main across the street.
And finally the sign in front of the building for the Candlewalk Tour Home. This week we will be painting, cleaning, and staging upstairs.
Getting Closer
We are getting closer. They finished painting the front and west sides of the building.
They started framing of the 2nd floor windows. When we installed the new windows they temporary installed them to dry in the building. Now they are finishing the installation.
HVAC continues downstairs.
And we started to seal the upstairs brick in the shower area.
Before
After
Finally framing is almost complete. Here is the rotating door to the closet. We salvaged it from the building when there was a photography business upstairs and they had a dark room door.
Exterior Painting
We are starting to get noticed!!!!! Almost everything up to this point has been inside and not exposed to the general public. This week, all of that has changed. We were going to wait until the very end to paint the exterior walls but they needed it completed prior to installing the fire escape stairs on the west wall. The weather slowed them down but they should finish everything this upcoming week.
The exterior painting is being completed by Guillermo’s Painting located at 2209 N. Main St. Ste 168, Cleburne, TX