Water Main Extension Finished

There is mud everywhere but they finished the water main extension from across the street. Once everything dries out they will pave it over. It’s been a dirty couple of weeks. We have footprints all over our new floors. This past weekend they filled the pipe with water to ensure there are no leaks. This week everything will be connected and the water turned on to our Fire Suppression System.

UNADJUSTEDNONRAW thumb 345c

UNADJUSTEDNONRAW thumb 345b

UNADJUSTEDNONRAW thumb 3459

Water Main Continues

We thought they were almost done. The City decided to extend the water main all the way down the alleyway. This makes sense so that the buildings on Caddo Street can utilize it without having to tie into the Water Main in front, on Caddo Street, which is a State Highway.

We have had rain the last couple of days and it’s a muddy mess.

UNADJUSTEDNONRAW thumb 3459

UNADJUSTEDNONRAW thumb 345b

Here’s what the actual water main looks like.

 

UNADJUSTEDNONRAW thumb 3451

This has been an adventure watching them work:)

 

UNADJUSTEDNONRAW thumb 344f

Water Main Tie In

We are getting close to tying into the Water Main from across the street. We already have water to the building but its just a supply line for basic water access. This is the extention for our Fire Suppression System. It should be completed in the next couple of days.

UNADJUSTEDNONRAW thumb 344e

As for downstairs, everything else is going as planned. This past week we finished painting the remaining drywall and cleaning everything left over from Christmas’s CandleWalk Event. This upcoming week we are starting the coordination to repair/seal the brick, restoring the floors, and cleaning/calking the front windows. Once that is complete we can start to look at renting it out. We are still not sure what it will be at this point. Stay tuned for updates:)